Sample Bid Package
Knowledge Base Templates Book a Call →
Free Download · No Sales Call · Complete Mode A Output

See Exactly What
Vernier Produces.

This is a real Vernier Mode A output on a commercial electrical project — the same package a Vernier subscriber receives. Platinum, Gold, and Silver proposals. Line-item estimate. Bill of materials. Schedule matrix. Risk register. Competitive analysis. All of it. Before you subscribe to anything.

Project is anonymized. All figures are realistic for a commercial electrical scope of this size and type in Western Washington.
Get the Sample Package
Enter your email and it opens immediately. No wait, no sales call.
Name is required.
Valid email required.
Your email is used only to send you the confirmation link.
No spam. No sales sequences. Unsubscribe anytime.
Opening Now.
Your sample package is opening in a new tab. A confirmation has been sent to your email.
Open Package Again
Want Vernier running on your actual projects? Book a 30-min call with Randy →
What's Inside the Package
Platinum Proposal — $512,400
  • Turnkey scope, zero owner risk
  • Extended 3-year warranty
  • Dedicated PM with direct owner access
  • Includes all contingency and change buffer
  • Full scope narrative (2 pages)
Gold Proposal — $481,200
  • Full scope, standard industry terms
  • Standard 1-year warranty on workmanship
  • Primary bid — target margin achieved
  • 28 line-item detail with unit pricing
  • Scope narrative + exclusion list
Silver Proposal — $458,900
  • Tight scope, owner carries defined risks
  • 7 specific exclusions documented
  • Standard warranty, phased access required
  • 3 clarification items requiring owner response
  • Change order trigger events pre-defined
Line-Item Estimate (28 items)
  • Service entrance & switchboard
  • Panelboard distribution (7 panels)
  • Conduit and wiring (14 categories)
  • Lighting systems + controls
  • Fire alarm + nurse call
  • NECA labor units with productivity factors
Schedule Matrix (8 phases)
  • Underground rough-in — 3 weeks
  • Slab in-slab conduit — 2 weeks
  • Above-ceiling rough-in — 6 weeks
  • Gear installation + terminations — 3 weeks
  • Trim-out + testing + commissioning — 4 weeks
  • Total duration: 21 weeks
Risk Register + Walk-Away
  • 6 risk items (3 medium, 2 low, 1 high)
  • Mitigation strategy for each
  • 4 walk-away conditions documented
  • Self-perform advantage: $38,400
  • Bid posture: STANDARD with reasoning

Ready to Run This on Your Actual Projects?

The sample took about 30 seconds of Vernier processing. A calibrated Vernier account produces this output for any project you're pursuing — in about two hours of your time instead of twelve.